Work is well underway on an 18-20 month building project, that will result in a state-of-the-art, two storey Independent Learning Centre (ILC) and spacious new, two-story Refectory.
The new ILC will be dedicated to silent, independent study, with the emphasis on access to digital resources, while the spacious, two-storey Refectory that will include improved serving and socialising spaces, with a second servery located on the first floor.
To find out more, see page 4 to 5 of the College’s latest On Route newsletter
www.reigate.ac.uk/wp-content/uploads/2021/12/09_on-route_dec_2021.pdf